Lawn replacement · Colorado
Snowmass Water and Sanitation District Turf Replacement Program
Run by Snowmass Water and Sanitation District (CWCB grant funded)
- What you get
- $2.00 per sq ft for low-water plantings (max 3,000 sq ft); $1 per sq ft for gravel or permeable hardscape (cap 1,000 sq ft)
- Maximum
- $6,500 per household
- Who qualifies
- District water customers with established cool-season turf.
- Where
- Water customers of Snowmass Water and Sanitation District in Snowmass Village.
- Status
- Open. Complete by Oct 1, 2027.
- Type of payment
- Bill credit
What you do
Replace healthy cool-season turf with low-water plantings.
Requirements
- Existing healthy cool-season turf
- Plants from Aspen Water Efficient Landscaping Standards Appendix B
- Reach 50%+ vegetation coverage at maturity
- Separately irrigate new area or leave unirrigated
- Complete by October 1, 2027
The plan or design it asks for
Before starting: pre-construction photos, scaled sketch plan of plantings and new irrigation plan, plant list, and proposed timeline.
Make the plan in Sow
Draw the layout and build the plant list
Sow places plants on a photo of your yard and keeps a list of everything you add. Check Snowmass Water and Sanitation District's rules for exactly what to submit.
How to apply
- 1Site visit and pre-construction photos
- 2Submit landscape plan, plant list and timeline
- 3Receive District letter of intent with estimated rebate
- 4Complete project; post-construction site visit
- 5Rebate applied to water bill
Estimate your rebate
Uses the published rate per square foot of turf replaced with low-water plantings and the $6,500 cap. The program sets the final amount after its inspection.
Enter an area to see an estimate
Timing and deadlines
not published
Sources
- https://snowmass.specialdistrict.org/files/053a3108d/Turf+Replacement+Program+Checklist.pdf (official page)
Last checked October 17, 2026. See something out of date? Tell us.
Sow is not affiliated with any of these agencies or utilities. Amounts and rules change, often at the start of a fiscal year, so confirm the details on the official page before you start a project. How we research these programs