Trees · England
Woodland Trust MOREhedges Hedge Planting Scheme
Run by Woodland Trust
- What you get
- Trees and tree protection supplied, covering up to 75% of the cost
- Who qualifies
- Landowners planting at least 100 m of new hedging in a single run that links woodland.
- Where
- Landowners anywhere in England planting at least 100 m of new hedge.
- Status
- Open. Applications accepted for the coming planting season.
- Type of payment
- Cost share
What you do
Plant 100 metres or more of new hedge that links woodland, with saplings, tree protection and funding from the Woodland Trust.
Requirements
- At least 100 metres of new hedging in a single run
- Allow a large tree to grow every six metres
- Must connect with at least 0.2 ha of existing or newly planted woodland (0.1 ha in Scotland), or link woodlands less than 500 m away through existing hedgerows
- Not for gapping up or replanting existing hedgerows, or hedges around buildings
How to apply
- 1Apply online through the MOREhedges page
- 2Agree the planting and costs with a Woodland Trust advisor
- 3Plant during the November to March season
Sources
- https://www.woodlandtrust.org.uk/plant-trees/trees-for-landowners-and-farmers/morehedges/ (official page)
- https://www.woodlandtrust.org.uk/plant-trees/large-scale-planting/
Last checked October 22, 2026. See something out of date? Tell us.
Sow is not affiliated with any of these agencies or utilities. Amounts and rules change, often at the start of a fiscal year, so confirm the details on the official page before you start a project. How we research these programs
Free to cite
Quote it with credit and a link to this page. The amounts and rules come from Woodland Trust's official page, linked above, so check it before you publish.
Source: Sow, “Woodland Trust MOREhedges Hedge Planting Scheme,” Yard rebates directory, checked October 22, 2026, https://www.usesow.com/rebates/england/woodland-trust-morehedges
More programs near England
- Open
Woodland Trust MOREwoods Tree Planting Scheme
Woodland Trust
Trees, tree protection, site visit and woodland design supplied, covering up to 75% of costs; for woodland over 1 ha a Trust-arranged contractor can plant, covering up to 60% of all costs
- OpenPlan required
Forestry Commission England Woodland Creation Offer
Forestry Commission
Up to £10,200 per hectare for standard capital costs, plus £400 per hectare a year for 15 years maintenance, up to £12,700 per hectare in additional contributions for public benefits, and £1,100 per hectare on low sensitivity land