Stormwater fee credits · Georgia
Gwinnett Stormwater Fee Credit for Rain Barrels
Run by Gwinnett County Department of Water Resources
- What you get
- Up to 3% credit on the stormwater utility fee (full 3% if every downspout has a barrel; partial credit pro-rated by share of downspouts served, e.g. 2 of 6 downspouts = 1%), 5-year term
- Who qualifies
- Property owners in Gwinnett County who pay the stormwater utility fee (credits are applied to the fee on the property tax bill).
- Where
- Property owners in unincorporated Gwinnett and cities served by the county stormwater utility.
- Status
- Open. Credit listed on the current county utility fee page; no funding cap (it is a fee credit, not a rebate)
- Type of payment
- Fee credit
What you do
Install a rain barrel of at least 50 gallons at each downspout (or an equivalent underground downspout drain or dry well) and apply for a credit on the stormwater utility fee.
Requirements
- Minimum 50-gallon barrel per downspout, or an alternate of the same volume (50 ft of 6-inch perforated pipe in gravel with no outlet, or a 2.5 x 2.5 x 3 ft rock-filled dry well)
- Overflow must be directed away from the building foundation
- Site map showing structures and the location of every rain barrel or alternative (printable from the county GIS viewer)
- Date-stamped photographs of each barrel connected to its downspout
- New application required every fifth year; credit expires without notice
- Conditions of approval must be maintained during the term
- Combined credits on one property cannot exceed 40%
The plan or design it asks for
A site map of the parcel showing buildings and the location of every rain barrel or alternative, submitted with the application.
Make the plan in Sow
Draw the layout and build the plant list
Sow places plants on a photo of your yard and keeps a list of everything you add. Check Gwinnett County's rules for exactly what to submit.
How to apply
- 1Complete the Stormwater Service Fee Credit Application Form (free)
- 2Attach the site map and date-stamped photos
- 3Mail to Gwinnett County DWR, c/o GIS Inventory and Billing Team, 684 Winder Highway, Lawrenceville, GA 30045, or email [email protected]
- 4Questions: 678.376.7193 ext. 4
Timing and deadlines
not published
None published; reapply every 5 years
Combining it with other programs
Can combine with other stormwater credits (public participation, training, rain garden, sprinkler sensor) up to a 40% total cap
Sources
- https://www.gwinnettcounty.com/government/departments/water/what-we-do/stormwater/utility-fee-credits (official page)
- https://www.gwinnettcounty.com/documents/d/gwinnett-county/stormwater-service-credit-form-current-pdf
- https://www.gwinnettcounty.com/documents/d/gwinnett-county/gwinnett-stormwater-credits-manual-pdf
Last checked October 17, 2026. See something out of date? Tell us.
Sow is not affiliated with any of these agencies or utilities. Amounts and rules change, often at the start of a fiscal year, so confirm the details on the official page before you start a project. How we research these programs
More programs near the same area
- OpenPlan required
Gwinnett Stormwater Fee Credit for Residential Rain Gardens
Gwinnett County Department of Water Resources
Up to 10% credit on the stormwater utility fee, pro-rated by the share of the property's impervious surface the rain garden serves (30% served = 3%), 5-year term
- Open
Gwinnett Stormwater Fee Credit for Sprinkler Rain Sensors
Gwinnett County Department of Water Resources
10% credit on the stormwater utility fee for a one-year term