Native plants and pollinator habitat · Minnesota
RPBCWD Stewardship Mini-Cost Share for Native Plants
Run by Riley Purgatory Bluff Creek Watershed District (RPBCWD)
- What you get
- 95% cost share up to $500 for a yard project; up to $1,500 within 50 feet of the shoreline of a major lake
- Maximum
- $1,500 per household
- Who qualifies
- Residents of the watershed district, including renters, for projects in their yard.
- Where
- Residents, including renters, of Riley Purgatory Bluff Creek Watershed District.
- Status
- Open. Per 3/18/2026 program summary; confirm current round with district.
- Type of payment
- Cost share
What you do
Install a native plant project with roots in the ground in your yard (pocket prairie, pollinator garden, native shrub or tree planting).
Requirements
- At least 75% of reimbursement must go to native live plants and/or native seeds
- Native range must include southern MN, northern Iowa or western WI; straight species only, no cultivars/nativars
- Plants and seed grown in southern MN, northern Iowa or western WI; name of grower/retailer must be provided
- Plant selection matched to sun and soil moisture; diversity and bloom-time variety for some project types
- No fungicides or insecticides; limit herbicide to weed control; pull weeds at least three times a season
- Install by November 30 of award year
- Maintain at least 2 years
How to apply
- 1Learn what qualifies as a native plant
- 2Submit simple online application (site visit optional)
- 3Accept offer and agree to terms
- 4Install project and submit report with photos and receipts by November 30
- 5Receive reimbursement
Timing and deadlines
Install by November 30 of award year
Install by November 30 of award year
Combining it with other programs
Not published
Sources
- https://rpbcwd.org/stewardship-cost-share (official page)
- https://rpbcwd.specialdistrict.org/files/90e24bdc2/Handout+Stewardship+Program+Summary_2026.pdf
Last checked October 17, 2026. See something out of date? Tell us.
Sow is not affiliated with any of these agencies or utilities. Amounts and rules change, often at the start of a fiscal year, so confirm the details on the official page before you start a project. How we research these programs
More programs near the same area
- OpenPlan required
RPBCWD Stewardship Standard Cost Share
Riley Purgatory Bluff Creek Watershed District (RPBCWD)
75% cost share up to $5,000 for a residential project
Up to $5,000 per household
- Out of funds
NMCWD Cost Share Grants
Nine Mile Creek Watershed District
Reimbursement with 25% applicant match; resident maximums $3,750 for habitat restoration or native plantings and $6,250 for other eligible projects
Up to $6,250 per household
- Status not postedPlan required
LMRWD Cost Share Incentive and Water Quality Restoration Program
Lower Minnesota River Watershed District
Reimbursement of up to 50% of project cost (materials, labor, engineering, consulting); $500 minimum grant; maximum $2,500 for residential
Up to $2,500 per household
- Open
Bloomington Water Utility Smart Irrigation Controller Rebate
City of Bloomington Public Works Water Utility
$100 per WaterSense smart controller; $5 per WaterSense sprinkler body (limit $100)
Up to $200 per household
- Open
City of Chaska Electric Outdoor Lawn Equipment Rebate
City of Chaska Electric Department
Trimmer, edger, cultivator, chainsaw, leaf blower $30 each; push mower $75; snow blower $100; riding mower $200
Up to $200 per household
- Open
Xcel Energy Outdoor Electric Equipment Rebate
Xcel Energy
60% of equipment cost up to: push mower $75, riding mower $200, push snow blower $100, trimmer (string or hedge) $30, edger $30, cultivator $30, chainsaw or pole saw $30, leaf blower $30
Up to $200 per household